Wednesday, 19 October 2011

breeze blocks

first thing I did was to make sure I was wearing the right P.P.E boots gloves goggles to protect my skin/hands eyes and feet from any dust or falling blocks or bricks.
I then started by moving 5 breeze blocks to where i was going to make the wall i then got a spirt level marking gauge and trowel to make sure that it was level and not  leaning.
i then drew out a line where the edge of the blocks was going to stand, after marking out i then started laying pug on the line and placing the blocks on top of each other.
after finishing i showed it to the site manager and took it down after it was ok then i cleaned up my area and reported back to the sitemanager to my next task