Wednesday, 19 October 2011

breeze blocks

first thing I did was to make sure I was wearing the right P.P.E boots gloves goggles to protect my skin/hands eyes and feet from any dust or falling blocks or bricks.
I then started by moving 5 breeze blocks to where i was going to make the wall i then got a spirt level marking gauge and trowel to make sure that it was level and not  leaning.
i then drew out a line where the edge of the blocks was going to stand, after marking out i then started laying pug on the line and placing the blocks on top of each other.
after finishing i showed it to the site manager and took it down after it was ok then i cleaned up my area and reported back to the sitemanager to my next task

Tuesday, 18 October 2011

moving timber

I firstly got started by looking at the job sheet to find out what job I was going to be doing "moving timber".

I then starting filling out a risk assessment on the task.
After completing the risk assessment I started by checking the delivery ticket and made any changes that were needed.
I then started putting on my P.P.E
Boots- to protect my feet from dropping paint
Gloves- to protect my skin from the paint
Goggles- to protect my eyes
after putting on all P.P.E I started to check the route to make sure that there were no obstructions.
After making sure the route was clear I started moving the timber from the storeroom to the workshop
till the task was finished.
I then reported back to the site manager for further instruction




Monday, 17 October 2011

making a small pyramid of bricks

first thing I did was to report to the site manager to find out what task I was about to undertake " building a pyramid 4-3-2-1"
i then started putting on my PPE
boots
gloves
goggles to protect skin/hands eyes and feet


Monday, 10 October 2011

bricklaying

I started by fetching 2 breeze blocks and placing them on the floor where the pug was going.
I then picked up a small board and placed it on top of the blocks.
I then picked up 10 facing bricks and placed them on the floor.

I then began by getting a spirt level and height gauge and drawing a line soo the wall is straight, "1115mm"
I then started putting pug on the floor and placing the bricks on top of the pug "the face toward me"
5 bricks - 4.5 bricks - 4 bricks - 3.5 bricks etc
     
      

copper pipe

Presentation