Monday, 10 October 2011

bricklaying

I started by fetching 2 breeze blocks and placing them on the floor where the pug was going.
I then picked up a small board and placed it on top of the blocks.
I then picked up 10 facing bricks and placed them on the floor.

I then began by getting a spirt level and height gauge and drawing a line soo the wall is straight, "1115mm"
I then started putting pug on the floor and placing the bricks on top of the pug "the face toward me"
5 bricks - 4.5 bricks - 4 bricks - 3.5 bricks etc
     
      